all speaker
other blog
Tags
2 way crossover 6x9 Speakers AC Reactor active loudspeaker Car Amplifier Car Audio car coaxial speaker car component speaker car horn car mid range car speaker component car subwoofer car tweeter car woofer ceiling speaker grills clamp ferrule concrete nails drive speaker garden speaker high power speaker horn line array horn loudspeaker horn speaker line array box line array speaker loudspeaker box marine speaker marine speakers mini loudspeaker outdoorspeaker powered speaker power pro audio pro audio pro audio speakers professional loudspeaker pro speaker Sanitary pipe fittings stainless steel elbow subwoofer box super tweeter Transformers Electric Transformers Electrical Transformer Suppliers wall mount speaker woofer speaker
Tag Archives: AC Reactor
Defined
Web Design And Seo For www.china-webdesign.com
AC Reactor – China Manufacturer
Thank you for inquiry my AC Reactor, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-ac-reactor-101/
Reactive voltage optimization stands for the three-dimensional Power line Conditioner grid distributed reactive voltage optimization control system. System is the idea of ??coordination based on three dimensions (objectives, time and space of three dimensions) decomposition to achieve the reactive power optimization of the entire distribution network.
The target dimension, safe and stable operation of the power system and reduce network losses, improve voltage quality and reduce the reactive power devices adjust the number of multi-objective decomposition and coordination of control; on the spatial dimension in the high-voltage, medium voltage, low voltage three decomposition and coordination between the voltage levels; in the time dimension, the economy in the long process of voltage security in a short process, the need for the regulation of different time scales.
Posted in Uncategorized
Tagged AC Reactor, AC Voltage Regulators, Single Phase Voltage Stabilizer
Comments Off
Purified AC regulator
Web Design And Seo For www.china-webdesign.com
AC Reactor – China Manufacturer
Thank you for inquiry my AC Reactor, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-ac-reactor-101/
The basic structure: a method of combining sine wave energy distribution and the filter, to regulate the output voltage by adjusting the primary circuit of SCR conduction angle.
Advantages: high regulation accuracy of ≤ ± 1%, fast response time ≤ 40ms, Rush pulse filtering effect.
Disadvantages: output and input voltage between the phase shift, there is little waveform distortion (in addition to ≤ 3.5%) with some special load (such as the SCR load) is not ideal.
Applications: precision electronic equipment, medical equipment, computer rooms, laboratories, product aging test.
Posted in Uncategorized
Tagged AC Reactor, AC Voltage Stabilizer, Single Phase Voltage Stabilizer
Comments Off
Inverter
Web Design And Seo For www.china-webdesign.com
AC Voltage Regulators – China Manufacturer
Thank you for inquiry my AC Voltage Regulators, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-ac-voltage-regulators-102/
Inverter (Variable-frequency Drive, VFD) is the application of inverter technology and microelectronic technology, by changing the motor power frequency to control the power of the AC motor control equipment. The inverter is by rectifier (AC DC), filter, inverter (DC AC), the brake unit, drive unit, detection unit micro-processing units, etc.. By changing the frequency of the power supply to achieve the purpose of changing the supply voltage, according to the actual needs of the motor supply voltage, and thus they need to achieve energy efficiency, speed control purposes, the drive there are many protection functions, such as overcurrent , overvoltage, overload protection, and so on. With the continuous improvement of industrial automation, the drive has also been a very wide range of applications.
Three phase regulator parameters
Web Design And Seo For www.china-webdesign.com
AC Voltage Regulators – China Manufacturer
Thank you for inquiry my AC Voltage Regulators, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-ac-voltage-regulators-102/
Demand characteristics for the three-phase voltage regulator technology, as well as a number of purposes, the customer for the difference between ordinary regulator is puzzled.
Three-phase regulator is the basic technical requirements according to the regulator s research and development. Own development is energy-saving products of Western techniques, developed for the stability of the AC voltage. Can automatically maintain the stability of the output voltage when the external power supply network voltage fluctuations or load changes caused by voltage fluctuations. Three-phase voltage regulator and other forms of regulator compared with the large capacity, high efficiency, no waveform distortion, stable voltage regulation, widely applicable load, able to withstand transient overload, long-term continuous work, manual automatic control switch freely with overvoltage, overcurrent, phase sequence, mechanical failure of automatic protection device, as well as small size, light weight, easy installation and reliable operation.
Three-phase regulator s main features: large capacity, high efficiency, wide voltage range, high precision, strong protection function, the waveform distortion and small size, light weight, safe and reliable operation, long-term use, easy to maintain.
Three-phase voltage regulator control the scope of application: industrial and mining, oil, railways, construction sites, schools, hospitals, post and telecommunications, hotels, and scientific research department of electronic computers, precision machine tools, computer tomography, precision instruments, test equipment, elevator lighting. imported equipment and production lines that require stable place of the supply voltage. Adapt to the supply voltage is too low or too high, the volatility of the low voltage distribution network the end user and load a large change in electrical equipment, especially suitable for all requirements of the regulator of electricity places on the grid waveform.
Widely applicable to various types of a mains interrupt and particularly important to load the exchange of emergency power supply, power supply such as all kinds of important computer systems; different types of construction work of power and fire power; hospital security of electricity supply; transport system highways, tunnels, subways, light rail, civil airports, the power supply; power supply; all kinds that can not cut production, the supply of laboratory equipment. The devices require pure sine wave of high-quality power supply.
Three-phase transformers are generally in order to adapt to too high or too low electrical R & D formed. China even the world whole, electricity power, product development, but also have to focus on its technical requirements.
Posted in Uncategorized
Tagged AC Reactor, AC Voltage Regulators, Neutral Current Eliminator
Comments Off
Transformer change pressure
Web Design And Seo For www.china-webdesign.com
AC Voltage Regulators – China Manufacturer
Thank you for inquiry my AC Voltage Regulators, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-ac-voltage-regulators-102/
Transformer between the products, more technical requirements point. An integral part of the transformer is divided into: core, coils, fuel tank, oil pillow, insulating sleeve and tap at the beginning. That which is used to exchange voltage?
The original transformer is made of electromagnetic induction. It consists of a silicon steel (silicon steel) quartet built the core and the two sets of coils around the core, between the core and coil insulated from each other, without any electrical contact, as shown. Connected to the transformer and power supply side of the coil called the primary coil (primary side), transformers and electrical equipment connected to the coil is called the secondary coil (secondary side). When the primary coil of the transformer to the AC power, the core will produce changes in the magnetic field lines. Secondary coil wound on the same core, the magnetic lines of force cut the secondary coil, bound to the induced electromotive force on the secondary coil, the coil both ends of the voltage. Alternating magnetic field lines, the voltage of the secondary coil is alternating. Exactly the same frequency and power frequency. Confirmed by theory, the transformer primary coil and secondary coil voltage ratio and the primary coil and secondary coil turns ratio can be expressed as: primary coil voltage / secondary coil voltage = primary turns / secondary coil turns description of the number of turns is more, the higher the voltage. It can be seen, the secondary coil is less than the primary coil, is the step-down transformer. On the contrary, compared with the step-up transformer.
Transformer through the above method, the voltage of the exchange, plays a protective effect on the circuit.
Posted in Uncategorized
Tagged AC Reactor, AC Voltage Regulators, Energy Saving Regulator
Comments Off
rail traction transformer production in Ningxia Wolong
Web Design And Seo For www.china-webdesign.com
AC Voltage Regulators – China Manufacturer
Thank you for inquiry my AC Voltage Regulators, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-ac-voltage-regulators-102/
Reliability with large-capacity high-speed railway traction transformer is Yinchuan Wolong Transformer Co., self-developed products, which not only fill the gap, but also to bid farewell to the Chinese products had to rely on imports of history.
Recently, the Reporters Committee was informed by letter from the Ningxia Hui Autonomous Region: China with independent intellectual property rights, world-class section of Beijing-Guangzhou and Wuhan-Guangzhou high-speed railway to meet the current World Expo Huning (Shanghai – Ningbo), Shanghai-Hangzhou (Shanghai – Hangzhou) high-speed Railway, all with the Ningxia Yinchuan Wolong Transformer Co., Ltd. production of 220kv reliability with large-capacity high-speed railway traction transformers.
Reliability with large-capacity high-speed railway traction transformer is Yinchuan Wolong Transformer Co., self-developed products, which not only fill the gap, but also to bid farewell to the Chinese products had to rely on imports of history. Wuhan-Guangzhou section of Beijing-Guangzhou high-speed passenger rail line used in all the company s 220kv reliability with large-capacity high-speed railway traction transformer, the train speed up to 350 km trial run before hitting 394 km / h high-speed, the Guangzhou and Wuhan closer to three hours. In the Beijing-Guangzhou high-speed railway, Huning (Shanghai – Ningbo), Shanghai-Hangzhou (Shanghai – Hangzhou), Zhengzhou – Xi an, the reliability of large-capacity high-speed railway traction transformer bid, Wolong s unique product, similar products may be comparable with the international.
Currently, the country s commitment to high-speed passenger rail line and the required high-level research tasks traction transformer. Independent research and development of low-loss energy-efficient 110,000-volt transmission and 220,000-volt power transformers are used to fill product gaps and autonomous regions.
Posted in Uncategorized
Tagged AC Reactor, AC Voltage Regulators, Automatic Voltage Regulator
Comments Off
Yuns Transformer oil filter in use
Web Design And Seo For www.china-webdesign.com
Automatic Voltage Regulator – China Manufacturer
Thank you for inquiry my Automatic Voltage Regulator, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-automatic-voltage-regulator-182/
Recently, with the factory personnel after installation, commissioning, Yuncheng, Shandong Province Power Company 110 kV and 35 kV substation Gold River new transformer substation west line oil filter was put into use.
On-line oil filter is mainly used for 35 kV and above the main transformer on-load tap loop filter insulation oil, transformer system of the device to normal operation in the case, according to the switching regulator of automatic on-line oil filter, the effective removal of oil in the free carbon, metal particles, impurities and acid cracking, tap oil recovery dielectric strength and performance, and reduce trace moisture, effectively improve the on-load tap-work security and reliability, significantly reduce maintenance outage times, to extend the maintenance cycle, improve power quality, increase oil life, is an energy-saving environment-friendly products.
Line oil filter installation, commissioning, not only further enhance the safe operation of the transformer, to reduce power outages, but also saved the company a lot of money.
Posted in Uncategorized
Tagged AC Reactor, Automatic Voltage Regulator, Power Stabilizer
Comments Off
East County Power Authority to explore market-oriented mode of operation of transformer theft
Web Design And Seo For www.china-webdesign.com
dry type transformers – China Manufacturer
Thank you for inquiry my dry type transformers, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/
\"Since people care transformer, we have poured my heart at ease and more electricity,\" and recently, East County in Hebei Province Township, a large single-poured to the people pleased the author said. County electric power transformer protection of agricultural irrigation right to \"sell\" this approach to the security company, effective solution to the safe use of electricity in rural areas is a major \"illnesses frequently stolen \"—- agricultural irrigation transformer to ensure the normal people electricity production and living, healthy and orderly development of the community to provide a harmonious atmosphere.
In recent years, Hebei Province, East-County Farmers irrigation transformer theft, serious damage in 2007 alone, it lost East County agricultural irrigation transformer 150, the direct loss of 200 million, indirect costs can not be calculated. Speaking of the pain of agricultural irrigation transformer stolen, lights out Sizhen East County suffered Kuni village, the village had lost the night before six agricultural irrigation transformer, transformer theft criminals who are mostly at night, driving a motor vehicle with a professional cutting tool, a habitual theft 10 minutes to put a transformer removed, placed on the vehicle pulled away, a transformer less ten thousand dollars, then buy a stolen easier said than done, both to increase costs, but also delays in farming, the people of grievances, the inveterate disease seriously endanger the normal production and life of farmers. Hire specialized care in many villages the transformer, and some village cadres shifts, night patrols, and even then very hard to detect, transformers are still often lost. Many villages in the slack season, put the transformer removed, install up the busy season, but back and forth demolition, lifting the cost of the village is spending a small fortune. To address this potential safety problems in rural electricity, East County Power Authority has also taken a variety of measures: to use the insurance transformer screws, safety security locks, on insurance, etc., but these approaches have failed to stop the live transformer stolen.
Transformer county farmers stung frequently stolen the hearts of East County Power Authority to help the farmers to think, worry farmers\\ needs, and actively seek solutions through visits to research, the final decision: the use of agricultural irrigation transformer protection rights \"to sell \"East County Feijian security to the limited liability company, the council to provide 70 million per year operating costs.
This mode of operation of the market after the introduction of the principle of mutual benefit, security companies and the 1094 East County agricultural irrigation transformer station signed a legal agreement and to each transformer installation of automatic warning devices. At the same time, security companies in the county set up a seven alarm the police sub-station, each site is equipped with real-time monitoring computers, connected to all the sub-station within the transformer, and each station is equipped with four coordinators and rural power , 24-hour shifts, 24-hour supervision, one has at any time the police.
Since October 2008, a security company to take over the East County Farmers irrigation transformer light security work, the county had not lost a transformer, this market-oriented mode of operation has yielded good results.
Sanjiu 2008 midnight, cold pressing, has entered the twelfth lunar month lunar eighth, there are days away from the Spring Festival, people busy day to sleep. At 2:19 minutes, the town of East-County Rural Power protection duty single point north of the village received the largest single-D067 break alarm, quickly out of the police officers on duty, ten minutes north of the village to reach the largest single-site transformer, theft molecules found someone, take from the hands of a stick to hit duty officers, duty officers responded quickly, with a flashlight to light the eyes of theft molecules, resulting in the theft can not see the target molecule, the molecular theft so he fled to the village every alley, followed by duty personnel , with the deal. Promptly notify the command center at this time 1 #, 2 # patrol cars rushed to the scene, and actively cooperate with the staff on duty, the theft of molecules captured and sent to the local police station. This mode of operation of the market not only in rural areas of the normal power supply is guaranteed, and because the patrol day and night patrols, making the area the people lost sheep, lost cattle phenomena are less, the thief also play a deterrent role .
East County Power Authority to spend money for the people \"buy\" to the liking of the cis-time service, not only to improve production and living conditions of farmers, a more healthy development of society provides a harmonious atmosphere. Hard work ahead in the East County Power Authority and all the staff, always adhere to \"urge economic development, service lives of the people\" for the purpose of serving the county economy in silence, quietly serving the masses …
Posted in Uncategorized
Tagged AC Reactor, AC Voltage Regulators, Dry Type Transformers
Comments Off
Operation and maintenance of 500kV transformer
Web Design And Seo For www.china-webdesign.com
Power Stabilizer – China Manufacturer
Thank you for inquiry my Power Stabilizer, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-power-stabilizer-149/
Operation and maintenance of 500kV transformer
At present, China\\ s electric power system three-phase AC transmission system, requiring three-phase transformer is, both can be used three single-phase transformer according to a certain wiring together, said three-phase transformer, three-phase winding can also share a core, according to a certain wiring together, said the three-phase transformer. Three-phase transformer or three-phase transformer\\ s wiring combinations known as connection group. Detailed description of the connection group, and in many books are introduced, no longer described. In the power transformer manufacturing practice, usually Y, yn0, d11, and YN, d11 three kinds of connection group. 500kV transformer in a three-winding autotransformer, its wiring group often YN, a0, d11. This connection group, said high voltage winding and voltage windings are used in star connection and the same phase, neutral grounding, wiring and low voltage windings for the angular, and the phase lag of high and medium voltage winding 30 °.
To make a long-term safe and reliable transformer operation, not only requires good quality transformer manufacturing, operation and maintenance also need the right to try to avoid a temporary power outage transformer maintenance, extended maintenance cycle, reducing the maintenance workload.
A transformer normal operation and inspection
1 transformer running
Transformer in the normal case, the long-term continuous operation, the normal operation of the transformer, including the following aspects:
(1) transformer in good condition. Includes the transformer body intact, without any defect; various electrical performance compliance; transformer oil standard of the indicators, oil level is correct, the sound is normal; the auxiliary equipment (such as cooling devices, surge devices, casing, gas following the electrical appliances, pressure release valve, etc.) intact, its status in line with operational requirements transformer.
(2) transformer ratings in line with operational requirements, including: voltage, current, capacity, temperature, auxiliary equipment required for the rated operating parameters (such as cooling the power supply unit, power supply control circuit work required, etc.) should also meet the requirements .
(3) operating environment to meet the requirements. Include a good grounding transformer, fastening the connector; the side of the arrester is working properly; the protection device is working properly and so on.
(4) cooling system intact.
2 transformer inspection
Transformer during operation, should be inspected at least once a day, every week for a night patrol; in case of bad weather but also step up inspections. Detailed records of each visit should be prepared.
On-site visits to check the following items should be:
(1) transformer top oil temperature is normal, whether close to or exceed the allowable limit.
(2) transformer oil pillow oil level is normal, whether it corresponds with the oil temperature.
(3) the sound of the transformer to run compared with the past without exception, such as increased noise or other sound so new.
(4) each side of the transformer casing surface is clean, without damage, cracks and traces of discharge, for oil-filled casing should also check the oil level is normal, with or without oil leakage phenomenon.
(5) each side of the transformer terminals or connection fittings are complete, fastening, with or without signs of overheating.
(6) the phenomenon of transformer oil tank leaks, tank shell valves on the status of compliance with various operational requirements.
(7) cooling system is operating properly, such as fans, submersible pump is required to run fans, submersible pump running sound is normal, wind direction and the flow of oil is correct.
(8) Check the tap changer position indicator is correct. For parallel operation of single-phase transformer or transformer, you should also check the location of the tap changer are the same.
(9) Check the respirator in the silica gel is red; respirator small oil cup of oil is appropriate.
(10) electric control boxes and all kinds of electrical devices inside the body is intact, the location and status is correct; tank shell seal is good.
(11) in the following cases, the primary response variable for special examination:
a) after each trip. Main transformer overload and over-voltage operation, special attention should be temperature and overheating and vibration, body oil, etc., should be inspected once every half hour, and make records.
b) Each lightning, high winds, hail, heavy rain and other inclement weather later.
c) area near the main transformer failure.
d) other when necessary.
3 transformer monitoring and operating records
In the substation control room, there are many instruments and protection devices, used to monitor the operational status of the transformer, to ensure the safety of the transformer. Therefore, the transformer should run in record time voltage, current, active power, reactive power, transformer oil temperature and oil level and other data. If abnormal transformer should be checked immediately.
Second, the transformer overload operation
Transformer overload operation, the transformer is in the run-time transmission capacity of more than the rated capacity of the transformer. Three-phase transformer the rated capacity of S N = 〖KF (3〗 〖KF)〗 I NU N, while the operation is recorded in the output transformer active and reactive power output, it must be converted
S = S 2 P + S 2 Q
(2-28)
When S> S N, then the transformer over-load operation. Transformer overload must be current than the rated current, the transformer load loss when the sharp increase in temperature will inevitably cause the transformer, the transformer temperature, the life of the transformer operation and great harm. Therefore, the transformer must be limited over-load operation. This limitation is actually a transformer winding hot spot temperature control. From this point of view, the transformer overload can be divided into the following three cases.
1 allows the overload
Although the transformer overload, but not over-load level, and before the overload, the transformer load is light, transformer top oil temperature is not high, the transformer winding hot spot temperature does not reach a hazardous level, this overload is transformer allowed.
(2) limit overload
Greater degree of transformer overload, so that the top oil temperature, transformer winding hot spot temperature may reach harmful levels, but has not yet reached dangerous levels, then the transformer, been able to continue running, but the threat will decrease the insulation strength transformer safety, affect the life of the transformer. This overload must be restricted.
3 banned load
Transformer overload of the larger, longer, so that the transformer top oil temperature exceeds allowable value, the transformer winding hot spot temperature has reached dangerous levels. Then continue to run if the transformer, hot oil will break down the insulation surrounding the bubble, a serious decline in dielectric strength may lead to a major transformer failure, this overload is to be prohibited.
Transformer overload operation, particular attention to the following points:
(1) closely monitor the temperature of the transformer winding and top oil temperature.
(2) all start cooling the transformer, or defects in the cooling mainly the cooling efficiency, the transformer overload should not be allowed to run.
(3) devices with on-load tap transformers, the load level is larger in the past should avoid regulating devices with on-load tap tap.
(4) The main change in the normal over-load and run accident case overload. Overload its normal value should be based on the main transformer to allow the load curve, the cooling medium and the main transformer overloading brought before the load to determine. Accidents over the normal load and overload of the run must be no anomaly in the main transformer to run. Such as the existence of the main transformer cooler damage, severe leakage of oil, there are serious flaws in the body to protect such cases, the overload is not allowed to run.
GB / T 15164 94 \"oil-immersed power transformer loading guidelines\" set forth in the design of the transformer according to GB1094 at rated load and normal ambient temperature (20 ° C ), its hot temperature of the reference value of 98 ° C , at this temperature the relative aging rate of 1, that in this condition, the transformer consume normal life. Hot spot temperature for each additional 6K, doubling the rate of aging. According to the transformer factory temperature rise test, converted to 20 ° C under hot temperature than 98 ° C much smaller (a difference of nearly 20 ° C ), so in fact the larger the temperature rise transformers are left margin degree. Because with the transformer in operation time increases, the thermal efficiency of its cooling system radiator due to dirt, oil pump reduced efficiency and other reasons than the factory down, the actual temperature may be higher than calculated. Of course, such as the manufacturer has provided a clear table of transformer overload capabilities, should be performed on the data provided by manufacturer.
Posted in Uncategorized
Tagged AC Reactor, Power Stabilizer, Single Phase Voltage Stabilizer
Comments Off
Self made simple small transformer winding machine
Web Design And Seo For www.china-webdesign.com
Power Voltage Regulator – China Manufacturer
Thank you for inquiry my Power Voltage Regulator, Tel:0086-577-88835717 E-MAIL:info@stabilizer-transformer.com
http://www.stabilizer-transformer.com/key-power-voltage-regulator-152/
Self-made simple small transformer winding machine
Switching transformer in R & D, and sometimes less than purchase a small transformer winding machine around, so the use of timber, # 8 wire, 3 long screws and 3 nuts and washers, etc. 3,5 produced a simple and small winding machine wire cage, winding out of several small ferrite transformers to good effect.
A winding machine production methods and procedures
A household production framework I use decorative wood flooring scraps, make a length, width, height 13139cm wooden frame. For strong, with 3 of the drill holes in the 8 (each side of the various types), with 4 wood screws to be fixed. Production, focusing on detailed, accurate and reliable. Framework is made, the corresponding end of the play in any a 3.6mm ~ 4mm hole, the hole around the center, selected as 2cm at the bottom, so that subsequent loading winding crank. A similar framework is also available ready-made wooden box, tin, etc. instead, geometry owing material system should, as long as you can fit.
2 Make the best use shake hacksaw (to keep ends smooth) made the interception of wire # 8 is shown in Figure 2 the shape of the crank. Then fell with a file to both ends of the flat head (also available wheel or coarse sandpaper, even in the polished concrete floor). Polished at both ends, based on the short head then end homogeneous rim edging to prevent shaking the hand when cutting.
3 assembly assembly before preparing 5 gasket 2, the long 2.5cm3cm, diameter 3 long screws 1, 2 3 nut, as well as A, B plastic (also known as brothers good), and can be assembled. Assembly steps are as follows: the crank through eight long side making a hole in a good frame, just wear eight frames in the inner man to wear a head shake to 5 pads, and then shake his head and then penetrate the penetration of the framework another hole. Next, shake the penetration hole in the head exposed to 5cm long, it will penetrate the inside of the gasket against the long wooden frame inside the head office, to transfer a good A, B glue amount applied to the crank and gasket with external, to be completely solidified glue before the fast (10 minutes to 20 minutes), turn the crank several times to prevent the rubber gasket over the hole will be exposed wooden frame and gasket bonding. After half an hour until the gel completely solidified, and then shake the long pole in the exposed sticky end in the same way a 5 pads, glue, the pole out, so that the inside of the inner gasket attached to the frame to prevent coil wound around the jitter. In short, inside and outside both sides of the gasket properly snapping, adhesive solidified, so to not turn around shake shake, and turn freely. Not long after, with A, B glue the 3 screws at the bulk head and shake at the long bond, bonding, the strive to make the two axes parallel to want to pay special attention to the plastic condensate, the correction is good parallelism between the two.
Second, the production line of roll cage
Winding transformer, you need a roll of magnet wire cage, I used # 8 wire to do a simple structure. Production Methods: a # 8 wire about 1m, bent by hand-by-side to the shape shown in Figure 3, a bad place to be curved shape with pliers. Bent at the interface after the stay of about 5cm long, connecting the wire at the overlap, then enameled wire wrapped tight. Finally, proper dressing, place it smooth. Then, find a large screwdriver or length greater than 15cm were able to wear hard plastic tube hole rolling lines, etc., with wire cage placed on line with the roll to roll smoothly around the system for rotating pay-off line. If you do have small units suitable wooden or plastic foam box, in the corresponding side of the midpoint of the two openings at the right size to dig two slot (groove depth slightly larger than the line roller supporting bar), but also as a line of roll cage.
Third, the transformer winding
Simple winding machine with the production of roll cage with wire wound transformers, basic and winding method is similar to the regular products, but also has its particularity, the following profile winding method. A fixed installation easy bobbin winding machine in the first 3 screws on the 3-screw one nut, screw people deep as the size of the bobbin, and gasket (gasket size as the frame size), then loaded frame, add a spacer, and finally tighten the screw nut on a good frame 3. In order to facilitate the wound, try to frame fixed to the screw at the end. 2 Position the wire roll thick with proper length and proper wishes to wear a hard wound roll straight rod hole, put a good line in the pre-cage system slot. 3 winding transformer coil winding machine on the desktop first place with a good wire cage around the distance of about 20cm (wire cage near the body). In order to prevent instability when winding winding machine, pressure in the top 32K of several books or other objects. Secondly, we must clear the coil end of the same name and different names corresponding to the skeleton of the pin end, then the coil can be wound up. Wound coil, the line control hand enameled about the direction of the cable side 5, non-overlapping lines in the same time, should ensure that the cable tight and tidy. Winding to the attention of a good number of laps recorded. Encounter many turns of the coil, should make a mark every 10 laps to prevent mistaken. Detailed method of winding transformer, not repeat them here.
Posted in Uncategorized
Tagged AC Reactor, Frequency Transformer, Power Voltage Regulator
Comments Off





